A1.2 - Processing and evaluation of measured data from Build-Up systems with special regard to various designs

Event
AMA Conferences 2015
2015-05-19 - 2015-05-21
Nürnberg, Germany
Band
Proceedings SENSOR 2015
Chapter
A1 - Force and Torque
Author(s)
M. Wagner, F. Tegtmeier - Physikalisch-Technische Bundesanstalt, Braunschweig (Germany)
Pages
39 - 43
DOI
10.5162/sensor2015/A1.2
ISBN
978-3-9813484-8-4
Price
free

Abstract

The largest force standard in Europe with a nominal force of 16.5 MN and an uncertainty of 1 x 10-4 is located in PTB, Braunschweig. Since there is a high demand for calibration in the meganewton range, this force scale needs to be exceeded. To realize this, the use of large bu-systems as transfer standards is considered [1]. A reliable uncertainty budget is a basic requirement for the traceability of force in the meganewton range using bu-systems. In order to create such an uncertainty budget, a method for the evaluation of measured data is necessary. An important aspect to be considered in this context is the broad variety of design principles of bu-systems.

Download